| | Click image above to view full size |
|
|
|
Not enough sand was available at initial earthworks for the site to be brought up to level. This mean I had the wonderful job of barrowing 3 cubic metres of sand up a hill to the observatory pad.
I could have hired a dingo for the job, but having already done that once for the initial earthworks I decided to save the money.
|
 |
|