| | Click image above to view full size |
|
|
|
|
Third was the fixed section of roof, which had to be put up before other walls, as the walls slot in under the roof. This required some serious muscle power from the volunteers, as the roof is very heavy, and needed to be brought up a sloap to the site.
|
 |
|